Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 49 results ...

Abdelkhalek, S I (2022) Managing the inspection process of concrete bridge decks, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

  • Type: Thesis
  • Keywords: accuracy; duration; optimization; bridge; traffic; deterioration; estimating; inspection; non-destructive testing; pollution; consultant; simulation
  • ISBN/ISSN:
  • URL: https://theses.lib.polyu.edu.hk/handle/200/11748
  • Abstract:
    Bridge deck provides a safe passage that facilitates goods shipping and people transit. This element is exposed to several deterioration sources, such as environmental conditions, pollution, and accidents. Deterioration in bridge deck is the most frequent reason for a bridge being classified as structurally deficient. Accordingly, regular inspections are usually performed to accurately identify the current condition of a bridge deck. Inspection is an essential step to effectively determine the proper interventions, avoid unnecessary or costly maintenance actions, and consequently reduce maintenance cost. In this connection, non-destructive testing (NDT) methods, e.g., impact echo, half-cell potential, and ground penetrating radar, are typically incorporated into the inspection process to eliminate the limitations of the traditional inspection approach (i.e., visual inspection) and to address more accurate assessment for surface and subsurface defects. Nevertheless, NDT techniques possess several challenges related to the selection of the most appropriate NDT approach, the large number of bridges to inspect, and the impact of inspection activities on traffic flow. Therefore, the primary aim of the present study is to optimize the inspection process of a concrete bridge deck considering four objectives: 1) model the duration and cost of the NDT inspection process, 2) assess the performance of NDT technologies from various perspectives, 3) design an optimized multi-technology inspection system, and 4) develop an optimized inspection schedule for a bridge network. Four models were developed to address the research objectives. In the first model (i.e., Bridge Deck Inspection Planning (BDIP) model), agent-based and discrete event simulation approaches were integrated to mimic the sub-processes involved in the inspection using NDT technologies. The BDIP can assist bridge authorities in estimating the inspection duration/cost and in measuring traffic disorder due to inspection activities. As for the second objective, a comprehensive Performance Assessment Model (PAM) was developed to precisely assess the performance of different NDT technologies considering different criteria (e.g., defect detection capability, ease of use, speed, and cost). The required data for this model were collected using a survey questionnaire, whereas the Analytic Network Process (ANP) technique and Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) were used to analyze the collected data. The outcomes of the model clearly illustrated the disparity in the performance of different NDT technologies. The findings of PAM and BDIP were integrated to develop a Bridge Inspection System Optimization (BISO) model (third objective). In this model, the simulation-based optimization concept was utilized to optimize the multi-technology inspection systems considering three main criteria: performance of the inspection system, inspection duration, and inspection cost. A discrete event simulation model was built in the optimization algorithm to emulate inspection activities and predict inspection duration and cost. Two optimization techniques were used: genetic algorithm and particle swarm optimization. BISO model aims to optimize the components of the multi-technology inspection systems, inspection team size, and overtime hours. Furthermore, it facilitates the selection of the most appropriate traffic control strategy to reduce traffic delays and bridge user cost. Finally, to consider bridges located in a large geographical area, a Bridge Network Inspection Planning (BNIP) model was developed by integrating discrete event simulation, geospatial information modeling, and genetic algorithm. BNIP aims to optimize the schedule of the inspection activities for a bridge network (i.e., select the best inspection route that connects bridges in the network). The developed models were verified using several techniques, e.g., comparing the findings with the results obtained from previous studies or field tests. In addition, the sensitivity of the developed models to variation in the inspection parameters was tested. The outputs demonstrated the capability of the developed models to optimize the inspection process. The outputs also proved the accuracy and effectiveness of the developed models in measuring inspection process characteristics (e.g., inspection duration and cost). This study made original contributions to the knowledge and practices of bridge deck inspection. In this respect, the main inspection criteria and parameters were identified and mapped. Four original models (i.e., BDIP, PAM, BISO, BNIP) were designed to plan the bridge deck inspection activities. These models provide strong support for bridge authorities, consultants, and contractors in optimizing the inspection process starting from selecting the utilized technologies to implementing the selected inspection technique(s).

Aoieong, R T (2004) Capturing quality costs of construction processes using the construction process cost model (CPCM), Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Au, C Y M (2013) An optimal contract strategy in managing extension of time provisions in building contracts, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Bao, Q (2003) Effective energy management during a building's life cycle, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, H L J (2011) Developing a fuzzy risk assessment model for target cost and guaranteed maximum price contracts in the construction industry of Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Chan, K C G (2012) The use of virtual reality for visualizing construction safety management process, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, K Y (2012) Optimizing construction planning and scheduling by virtual prototyping enabled resource analysis, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, P L (2004) Critical success factors for delivering healthcare projects in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Chan, T S A (2005) The impact of subordinates' professionalism on leadership effectiveness in the construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chan, W T P (2009) Construction industry development and government policy, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Chan, Y M T (2008) The role of finance in competitiveness of indigenous contractors in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Chen, Z (2003) An integrated analytical approach to environmental management in construction, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Dai, F (2010) Applied photogrammetry for 3D modeling, quantity surveying, and augmented reality in construction, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

De Saram, D D (2002) Measuring the quality of contractors' co-ordination activities during the construction process, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Fiona, T S C (2009) A critical study on performance-based fire safety design in Hong Kong with timber perforated ceilings as an example, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Fu, W K (2004) The effect of experience in construction contract bidding, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Guo, H (2009) Rethinking construction project management using the VP-based manufacturing management model, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Hao, J L J (2002) Better use of information: A simulation model for international construction joint ventures in China, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Hong, J (2006) A study on analytic approaches to intelligent buildings assessment, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Huang, T (2009) Virtual prototyping technologies enhanced construction planning, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Jaillon, L C (2009) The evolution of the use of prefabrication techniques in Hong Kong construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Kam, C W (2000) Quality assurance of construction works in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Lam, W M (2005) A conceptual model of success for design and build projects in the public sector of Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Lee, L P (2012) Do construction workers accept automated monitoring? A study on the acceptance level and its antecedents, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Leung, W Y (2006) A study of the competitiveness of local contractors in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Liang, Y (2006) Integrated IT systems for construction site management, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Lin, G (2009) Measuring the performance of value management studies in construction, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Liu, G W (2003) A framework for implementing value management in China's construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Liu, Y (2009) Critical factors for managing project communication among participants at the construction stage, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Lu, W (2006) A system for assessing and communicating contractors' competitiveness, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Luo, X (2011) A knowledge-based electronic meeting system for implementing value management in construction briefing, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Ochoa Paniagua, J J (2011) Production planning approach for implementing sustainable building projects, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Oo, B L (2007) Modelling individual contractors' bidding decisions in different competitive environments, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Pan, Y H (2007) Application of industrialized housing system in major cities in China: A case study of Chongqing, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Tan, Y (2009) Contractor's competitiveness and competitive strategy in Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Tang, L (2011) Effective and efficient briefing in public private partnership projects in the construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Tse, T-c (2009) The interoperability of building information models and document models in the Hong Kong construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Wang, S Q (1995) A methodology for comparing the productivities of the ready mixed concrete industries in major cities, Unpublished PhD Thesis, Department of Civil and Structural Engineering, Hong Kong Polytechnic University.

Wong, K W J (2007) Development of selection evaluation and system intelligence analytic models for the intelligent building control systems, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Wong, M W J (2006) Forecasting manpower demand in the construction industry of Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Wong, W H (2007) Developing and implementing an empirical system for scoring buildability of designs in the Hong Kong construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Xia, B (2010) The selection of design-build operational variations in the people's republic of China using Delphi method and fuzzy set theory, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yang, C (2004) Knowledge-based understanding and interpretation of construction engineering drawings, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yang, J (2010) A framework for stakeholder management in construction projects, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yao, H (2009) A dynamic approach for evaluating the sustainability performance of infrastructure projects, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Ye, K (2009) Modelling competition intensity in construction market, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Yip, R C P (2009) The cultural shift of the construction industry of Hong Kong under the influence of sustainable development, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).

Yuan, H (2011) A dynamic model for assessing the effectiveness of construction and demolition waste management, Unpublished PhD Thesis, , Hong Kong Polytechnic University.

Zhang, X (2010) Competitiveness for real estate developers: a China study, Unpublished PhD Thesis, Department of Building and Real Estate, Hong Kong Polytechnic University.